Bunkering Equipments Fabrication at Leelloyds Workshop; Installation & Commissioning Onboard at Anchorage
May 2023

Forward bunkering equipments design fabrication and retrofitting onboard with cargo lines modification at anchorage.
- Hose Reel (P&S)
- Hose Reel (P&S)
- Hose Reel Drip Tray (P&S)
- Hydraulic Remote Control Stand (P&S)
- Cargo pipes for Hose Reel
- Hose Roller Conveyor Tray (P&S)
- CCTV Camera Protection Box (P&S)
- Hydraulic Power Pack
- Delivery by Trailer from Workshop to Loading Wharf
- Installation of Cargo Line on Deck
- Lifting by Floating Crane Barge to Positions on Crane Barge at Anchorage
- Fabricate and Install Hydraulic Pipes from Power Pack to Control Stand to Hose Reel Hydraulic Motor
- Installation of Remote Control Stand at Forecastle Deck
- Installation of Power Pack at Forecastle Store
- Installation of CCTV camera at Forecastle, Funnel Deck, Poop Deck with Monitor and Controller in Wheelhouse
PREVIOUSNEXT